PT PEPC-ADK Pertamina Subsidiary signs the PSC

Posted by Admin

On 26 February 2014 at the Ministry of Energy and Mineral Resources (ESDM) the signing took place of the PSC Contract by and between SKK Migas and PT Pertamina EP Cepu ADK (PT PEPC ADK), witnessed by the Minister of ESDM and in the presence of members of the PT PEPC Board of Directors.

PT PEPC ADK became operator of the Alas Dara and Kemuning fields, located in the Blora Regency, Central Java, previously operated by Mobil Cepu Ltd. (MCL). In meeting its commitment with the Government, PT PEPC ADK will conduct GGRP Study, well re-entry, development plan, passive seismics and 3D study and exploration drilling.

Photo Caption:
The President-Director of PT PEPC ADK, Mr. Perry Widyananda (left), signed the PSC Contract, witnessed by the Minister of ESDM, the Director-General for Oil and Gas and the Acting Head of SKK Migas.